Friday, 26 October 2012

Survey



A mission to survey and find the component as listing below. It is important to calculate the budget on the hardware development. 



# Roughly the hardware will cost around rm250 for its developement


Friday, 19 October 2012

Chapter 1,2,3



Its time to prepare for the first three chapter of the FYP report.

Chapter 1: Introduction

1.1 Introduction of chapter
1.2 Project Background
1.3 Project Statement
1.4 Objective
1.5 Scope of Project / Limitation
1.6 Summary of Chapter

Chapter 2:Literature Review

2.1 History
2.1.1 Previous Work
2.1.2 Present Work
2.2 Review of History
2.3 Summary

Chapter 3: Methodology

3.1 Introduction
3.2 Block Diagram
3.2.1 Explanation
3.3 Hardware & Development
3.4 Software Development
3.5 Summary


Friday, 12 October 2012

VIVA Week


The presentation and VIVA for degree semester 1 in front of assessors has been done. 

Venue :            Gemilang Hall

Time :              2pm -5pm

Assessors:       a)Mr.Hisyam Mat Desa
                     b)Mdm Amalia

Project Title :  Design And Simulatin of Position And Speed Control of A DC motor

Friday, 5 October 2012

A week before presentation


Activity for this week

- A draft of proposal and slide presentation has been submitted to madam Zaridah.
- After having a short discussion, i was advised to improve the slide for the presentation day.




The assessor name has been released and the lecturers will be:
1- Sir Hisyam Mat Desa
2- Madam Amalia

# everything is running smooth at this moment :)